Services Delivered
A complete package of fit-out, refurbishment and specialist installation works delivered by CSM.
External Transformation
The project began with the refurbishment of the venue frontage, providing a modern and inviting appearance that reflects the new Bar10 brand.

Main Bar & Hospitality Area
A significant part of the project focused on the creation of a contemporary bar and seating area. Works included:
- Bespoke bar construction
- Decorative wall panelling
- Commercial flooring installation
- Lighting upgrades
- Decoration throughout
- TV and entertainment system installation
- Customer seating and hospitality areas
The finished space provides a modern, comfortable environment designed to maximise customer experience and operational efficiency.
Bespoke Bar Construction
Our in-house shopfitting and joinery teams delivered a bespoke bar installation featuring timber-effect finishes, durable worktops and integrated service areas.
The bar was designed to complement the overall venue aesthetic whilst providing a practical and efficient workspace for staff.
Bowling Entertainment Area
A key feature of the development was the installation and fit-out of the bowling lanes and surrounding customer areas.
Works included:
- Decorative finishes throughout
- Feature lighting installation
- Flooring installation
- Wall finishes and joinery details
- Customer circulation areas
- Entertainment display integration
The completed bowling facility creates a vibrant and engaging customer experience whilst maintaining a high-quality finish throughout.
Customer Facilities & Washrooms
As part of the project, customer washroom facilities were fully refurbished to provide modern, durable and easy-to-maintain spaces.
Works included:
- Wall tiling
- Cubicle installation
- Decoration
- Lighting upgrades
- Flooring installation

Golf Simulator Suite
As part of the Bar10 development, a dedicated golf simulator suite was constructed to provide an additional interactive entertainment experience for customers.
The space was fitted out with specialist wall finishes, integrated technology infrastructure and a large projection screen to accommodate the simulator system, creating a premium environment suitable for both casual users and organised events.
The completed room complements the wider leisure offering within the venue, helping establish Bar10 as a modern multi-activity destination.
Final Result
The completed Bar10 venue showcases Central Shop Maintenance's ability to deliver complex hospitality and leisure fit-out projects from concept through to completion.
By coordinating multiple trades, managing programme deadlines and maintaining exceptional quality standards throughout, the project was delivered successfully within the client's programme and budget requirements.
The result is a modern leisure destination combining hospitality, entertainment and customer comfort within a high-quality contemporary environment.
Bar10 Main Hospitality Area
Contemporary bar and customer seating area completed during the refurbishment.
Bar10 Washroom Refurbishment Irvine
Modern customer washroom facilities completed as part of the Bar10 fit-out project.

















